Install your tank level monitor
Proceed as follows to install your tank level monitor

Install your tank level monitor
Proceed as follows to install your tank level monitor
Installing your tank
level monitor
Make sure you have all the items that are included in the box
- Tank level monitor
- 3 AA lithium batteries
- Installation guide – French version
- Installation guide – English version


Hardware required for installation
Propane tank: Pre-installed R3D tank gauge (Rochester Gauges)
Fuel tank: Sinopé Fuel Level Remote Gauge FLRG-48
Important: Tanks that do not have R3D gauges can be upgraded. Contact your propane supplier for more details.
Installing the monitor batteries
Here are the steps to follow to install the batteries in the monitor.
Batteries must be installed at least 3 meters (10 feet) from the propane tank.
Unscrew the 2 screws using a square / flat screwdriver and separate the 2 parts of the monitor.


Install the batteries in the top part of the monitor.
Note: Install batteries as marked on the battery housing compartment.
Installation of the monitor on the tank
Here are the steps to install the Zigbee monitor on the propane or fuel tank.

The monitor can be installed using the magnetic base on several places on the tank. However, it must be cleared from the wall. Also position it so that the filling valve is free.
The tank monitor should be installed away from metal surfaces (aluminum or steel coatings, aluminum railing).
Propane tank
Insert the remote sensor into the R3D remote-ready dial until it snaps into place. Make sure the dial is clean before installing the remote sensor.
Note: The tank monitor can also be attached with screws (not included) or with plastic cable ties.


Fuel Tank
Insert the sensor into the Sinope float gauge dial (FLRG48) until it snaps into place.
Connect your tank monitor to the GT130 gateway or another compatible Zigbee gateway
Here are the steps to connect the tank level monitor to the GT130 gateway or another compatible Zigbee gateway.
Start the connectivity session by pressing the RF button on the GT130 gateway. The indicator light will start flashing.
Other compatible Zigbee gateway: Initiate the connectivity session of your compatible Zigbee gateway by referring to its user guide.


Connect your tank monitor to the network
by briefly pressing the button under the
device’s antenna.
Light | Status |
Green light blinks | Connection in progress |
Green light on for 10 s | Successful connection |
Red light on for 10 s | Connection failure |
Once connected, it is possible to check the
network status by briefly pressing the button.


When all your devices are connected, close the
connectivity session of your GT130 or other compatible Zigbee gateway.
Look for more topics
You will find below the most common issues you may encounter.
If you still need help, contact Sinopé technical support.